Skip to Content
JR CONSULTANCY
  • Sign in
  • Contact Us
  • Home
  • About
  • Services
  • Remote Consultation
  • Special Offering
  • Stationery Infrastructure
  • Electrical Infrastructure
  • Projects
  • Project Economics
  • Enterprise 360
  • Audit
  • Appointment
  • Events
JR CONSULTANCY
      • Home
      • About
      • Services
      • Remote Consultation
      • Special Offering
      • Stationery Infrastructure
      • Electrical Infrastructure
      • Projects
      • Project Economics
      • Enterprise 360
      • Audit
      • Appointment
      • Events
    • Sign in
    • Contact Us
    PROJECTS
    Stationery ProjectsWriting Instrument ProjectsElectrical Switch Gear ProductThin Wall Container ProjectGeneral CategoryComing Soon

    Stationery Projects


     

    Plant :  Dedicated to Kokuyo Camlin for Stationery Items.

    Scope of Project :  Conceptualization, Designing, Supervision and on ground implementation, from bare plot to fully accessorized functional production infrastructure. 





    Plant :  Dedicated to Stationery Items.





    Coming Soon ! 



    Stationery - Scale Project

    Production achieved in old machine / system -  46 seconds Average Cycle time.

    After implementation of automation solution.

    Production achieved - 18 sec Cycle time consistently for complete production shift

    Additional achievement - Labour retention directly related to extremely low labor stress in handling the machine.






    Stationery Product: Cap for Color Bottle




    Cap for Color Bottle


    Cap for Color Bottle



    Cap for Color Bottle 



    Cap for Color Bottle 





    Barrel Tip for Mechanical Pencil


    Coming Soon ! 


    Coming Soon ! 


    Coming Soon ! 


    Coming Soon ! 


    Coming Soon ! 


    Coming Soon ! 


    Writing Instrument Projects


    Project Details.

    Customer Requirement:

    • Designing and Setting up of a small sized Infrastructure for Manufacturing Ball Pen Product. 
    • Selection and Supply of precisely configured Primary Machines.
    • Selection and Supply of Automation Solution for Primary Machine.
    • Main Target: Achieving desired Conversion Cost for the Project, whereby desired Product cost for supply can be maintained and sustained.
    • Tool to be acquired by customer on their own.



    Acquired Tool Desing and Structure proved to be inefficient.

    Following Manual process for product take out resulted in production cost exceeding all limits. 

    Solution was required but had extreme economical constrains with respect to capital cost.

    Old - Manual Process of Product Take Out 

    Cycle time Average : 40sec to 46 Sec

    Stressful Manual Effort for operator engaging in the Product Take Out Process.





    Successful Automation Solution

    Solution was implemented.

    Capital cost (Automation) was refrained to about 20% in comparison to all options available in the market.

    Cycle time was reduced to the extent of increased production by factor of 2 times 

    Labour retention was achieved as this resolved the hardship of manual process.

    Overall conversion cost on plant level, exceeded all expectation of the customer

    Achieved Cycle time with Automation -  20sec

    Increase in Production in comparison to Manual Process -  110% increase in production

    Manual process only required for packaging of product produced.












    Customer Requirement.

    Product - Cap for Pen Barrel

    Automation solution needed to increase sustainable Production

    Simple Spruce Picker solution provided with customized, minor changes.

     













    Pen Product

    Barrel Bottom Plug ! 









    24 Cavity Barrel Production !










    Coming Soon !




    Coming Soon !



    Coming Soon !


    Coming Soon !


    Coming Soon !

    Electrical Switch Gear Product


     Dedicate Unit for Electrical Switch Gear Product.

     


    Coming Soon !  

     


    Coming Soon ! .




    Coming Soon ! .






    Coming Soon ! .


    Coming Soon ! .



    Coming Soon ! .


    Coming Soon ! .



    Coming Soon ! .



    Coming Soon ! .



    Coming Soon ! .



    Coming Soon ! .



    Coming Soon ! .



    Coming Soon ! .



    Coming Soon ! .



    Coming Soon ! .



    Coming Soon ! .



    Coming Soon ! .



    Coming Soon ! .



    Coming Soon ! .


    Coming Soon ! .


    ABS-FR 50% - Electrical Component


    Coming Soon ! .

     


    Coming Soon ! .



    Coming Soon ! .



    Coming Soon ! .


    Coming Soon ! .


    Coming Soon ! .


    Thin Wall Container Project



    60 Ton IMM  





    60 Ton IMM  




    60 Ton IMM 






    130 Ton IMM  






    180 Ton IMM





    200 Ton IMM 





    200 Ton IMM 





    200 Ton IMM  





    200 Ton IMM 





    200 Ton IMM  





    200 Ton IMM  




    Coming Soon !  


    260 Ton IMM 




    Coming Soon !  

    Coming Soon !  

    Coming Soon !  

    Coming Soon !  




    General Category



    220 Ton IMM  





    110 Ton IMM     


    Coming Soon !  




    Coming Soon !   




    Coming Soon ! 



    Coming Soon !  



    Coming Soon ! 



    Coming Soon !  



    Coming Soon !  



    Coming Soon !  



    Coming Soon !  


    Coming Soon !

    Coming Soon ! 


    Coming Soon !  

    Coming Soon !  

    Coming Soon !  

    Coming Soon !  




    Coming Soon



    Coming Soon !    



    Coming Soon !   


    Coming Soon !  




    Coming Soon !   




    Coming Soon ! 



    Coming Soon !  



    Coming Soon ! 



    Coming Soon !  



    Coming Soon !  



    Coming Soon !  



    Coming Soon !  


    Coming Soon !

    Coming Soon ! 


    Coming Soon !  

    Coming Soon !  

    Coming Soon !  

    Coming Soon !  




    Since 1974, creating true value for Processors.

    We partner with ambitious clients. We’d love to hear from you.

    Contact us

    person sitting front of laptop
    ​
    Powered by Odoo - Create a free website